Before & after

From bare earth to places people gather.

Six sites, before and after our work. Drag the handle, or focus it and use the arrow keys (hold Shift for bigger steps), then open any project to see more photos.

Before: Kilifi park amphitheatre during earthworks: bare terraced soil around the paved stage After: Kilifi park amphitheatre complete: grassed terraces around the brick and coral-stone stage
Amphitheatre, Recreational Park, Kilifi (2022). Design and construction supervision. View photos (5)
Before: The bed by the water tank before rehabilitation: an overgrown hedge and bare soil After: The bed by the water tank after rehabilitation: layered shrubs and white pebble mulch
Residence at KMA (2025). Landscape rehabilitation. View photos (5)
Before: The Karen site before design: rough grass and patchy ground under mature trees After: The finished Karen garden: lawn, a dry stream bed, cannas and young trees
Residence in Karen, Nairobi. Design and installation. View photos (3)
Before: The same UN courtyard during construction: bare red soil and drainage chambers After: Completed courtyard at the UN complex in Nairobi: paved path, lawn and a planted island between new office blocks
Courtyard, new UN office blocks, Nairobi (2023–25). View photos (5)
Before: NIA headquarters grounds before landscaping: rough grass, bare soil and a shipping container After: NIA headquarters after landscaping: finished lawn and planting beside the parking canopy
National Irrigation Authority headquarters (2024). The photos show the same grounds from different viewpoints. View photos (5)
Before: The Bubbles Hotel site before commencement: bare soil during the earthworks stage
After: The completed Bubbles Hotel grounds: planted slopes, lawns and a stone path
Bubbles Hotel, Mangu (2018). Master planning, landscape design and construction supervision. View photos (2)

Have a space that needs a new start?

WhatsApp us Call